Boiler Installation in Farmington, ME

Tell us about the job

Takes about a minute. No obligation.

New system or replacementBoilerFranklin County, ME
Step 1 of 2

What ZIP code is the job in?

Oil runs $23.73 per million Btu here

Maine homes paid $23.73 per million Btu of fuel oil in 2024. A boiler burning that fuel at a lower efficiency turns every degree of heat you lose into money, month after month.

The AFUE rating is worth asking for

A new boiler's AFUE rating tells you how much of that oil turns into heat for the house instead of going out the flue. Get it in writing on the quote before you compare prices between contractors.

Heat runs about ten months a year in Franklin County, September through June.

A boiler here spends most of the year working, so it needs to be sized for this place, not just installed.

Winter storms hit this county hard, and the power goes with them

142 severe weather events from 2015 to 2024
54% of homes statewide lost power a day or more in 2024
34 damaging wind events from 2015 to 2024

Half the homes in Franklin County were built in 1978 or earlier, half later. That split doesn't call for a bigger boiler or a smaller one. Sizing comes from the heat loss in your house, the windows, the walls, how it's insulated, not the year it went up. A contractor should measure that before quoting a size. If someone offers a number without walking the house or asking about it, that's worth a second opinion.

Most of Franklin County heats with oil. A new boiler can just pick up where the old one left off

More than half the homes in Franklin County heat with oil, and most of the boilers out there now burn oil too. Replacing one with another oil boiler means the gas line question never comes up, and the contractor is installing something this county already runs on.

Find a contractor
A man seen from behind in a grey shirt and tan work pants climbs stone steps toward a blue front door, carrying a canvas tool bag with hand tools in its side pockets, beside a blue planter with a small shrub.

The old boiler has to come out first

A boiler is heavy, full of water, and piped into the heating loop, so draining it and disconnecting it is its own job before the new one goes in. If it burns oil, the tank and line get disconnected too. None of this is quick work squeezed in around the install.

What happens to it after depends on what it's made of

Cast iron and steel boilers get scrapped for the metal. Anything that held oil gets drained and handled separately so nothing leaks on the way out. A contractor hauling away the old unit should be able to tell you how they're disposing of it, not just that they will.

Ask every contractor for the heat loss number on your house before you look at a quote, because that number is what the boiler size should come from, not a guess based on the old unit. Ask what's included in the venting, a chimney liner or a new vent pipe is part of the job, not an add-on found later. Ask how the new boiler ties into your existing zones and whether the circulator pumps get replaced or reused. Ask what happens if the boiler short-cycles once it's running, that's a sign it's oversized for the house, and a contractor who's measured correctly shouldn't see it. Ask for the warranty in writing, parts and labor both, and who honors it if the installer isn't the one you call next year.

Installation day starts with draining and disconnecting the old boiler, which takes longer than most people expect for something that's getting hauled away. Once it's out, the contractor works through the piping, the venting, and the wiring before the new unit ever gets fired up. Every zone valve and circulator gets tied back in and checked, because a boiler that's sized right still won't heat the house well if a zone isn't calling for heat correctly. Near the end, the system gets filled, purged of air, and brought up to pressure, then run through a full cycle so the contractor can watch it fire, modulate, and shut off the way it should. If the venting needs real work or a zone has to be repiped, the job runs longer than planned, and a contractor who tells you that going in is being straight with you.